Skip to content
Museum logo
Museum logo

Photo Record

Images

1 of 1977
2634--Brittle top layer of lmestone bedrock found 18" below top of door sil
2635--Chipped and fractured bedrock stratum under door sill.
2636--White-veined blue limestone bedrock at bottom of excavation for stair
2637--White-veined blue limestone bedrock at bottom of excavation for stair
2638--: Sizing and cutting geo-textile filter fabric for stone-bed underlay
2639--Geo-textile fabric covering bedrock.

Additional Images [26]

2640--Loading "2B" clean stone onto geo-textile fabric.
2641-- Leveling 2B stone bed.
0001-- Excavator to move earth, & set bed-stones, step-blocks, and risers
0002: Lower limestone step-block set on "rock-face" limestone bed stone.
0009: Limestone bed-stones supported on bedrock.
0016: granite riser & B3 in final alignment on 2B stone and screenings bed
0017:  leveling laser used to set elevations of landings and channel drains
0019: limestone bed stone supporting limestone step-block & channel drain
0020--setting B2.
0023--setting and leveling B2 on stone screening bed.
0026--setting and leveling L2 on stone screening bed
0030: Grappling granite bed-stone into position supporting sandstone landin
0031--Transporting B4 down embankment to staircase excavation.
0032--Preparing to set B4 in place
0033--screenings bed leveled to receive bed-stone B4
0037--B4 in place and leveled on screenings bed.
0052--L3 grappled with excavator bucket and "thumb" to its site.
0054--Leveling L3
0058--Setting mortar bed for CD2.
0063--: Troweling mortar into joints flanking CD2
0064--:Screening caps on channel drain mortar joints.
192--Constructing steps to cellar kitchen doorway at DeTurk House (2010)
180--Restored steps to cellar kitchen doorway at DeTurk House (2010)
186--Constructing steps to cellar kitchen doorway at DeTurk House (2010)
1084--East eaves wall detail and kitchen doorway
104: East eaves wall detail and kitchen doorway, staircase & walls complete

Metadata

Thank You!

Confirmation Message Here....